Deployment and Operation
During peacetime-to-wartime transition, the equip- ment can be rapidly installed on both sides of the linear target and linearly dispersed along the target’s alignment. Installation is completed once on-site power supply, communications, and control connections are in place. Prior to engagement, after powering on and starting the equipment via the command-and-control center or a local control terminal, it can carry out protection tasks fully automatically.
Performance Indicators
Counterable weapon types:
• Semi-active laser-guided weapons (SAL/SALH) Sensitive-zone diameter: ≥ Φ200 m
Effective range: ≥ 9 km
Response time: ≯0.5 s