Construction and Installation Requirements
· Distinguish between swing directions (inward/outward opening) and reserve reasonable installation space.
· The steel door frame must be securely fixed, with no tilt in any direction. Measures shall be taken to prevent displacement during concrete pouring.
· Door leaf installation shall commence 28 days after concrete pouring of the door frame.
· The door leaf must be balanced and tightly fitted to the frame to ensure its protective and sealing functions.
Product Specifications
| No. | Model / Parameter | Door Opening Width (mm) | Door Opening Height (mm) | Door Leaf Thickness (mm) | Remarks |
|---|---|---|---|---|---|
| 1 | GF0716(2) | 700 | 1600 | 196 | Door leaf width = Door opening width + 200 mm; Door leaf height = Door opening height + (Partially not shown in the image) |
| 2 | GF0716(1) | 700 | 1600 | 200 | |
| 3 | GF0818(1) | 800 | 1800 | 225 | |
| 4 | GF0818(0) | 800 | 1800 | 228 | |
| 5 | GF0820(0) | 800 | 2000 | 228 | |
| 6 | GF0918(2) | 900 | 1800 | 242 | |
| 7 | GF0918(1) | 900 | 1800 | 246 | |
| 8 | GF0920(2) | 900 | 2000 | 242 | |
| 9 | GF0920(0) | 900 | 2000 | 249 | |
| 10 | GF1020(2) | 1000 | 2000 | 262 | |
| 11 | GF1020(0) | 1000 | 2000 | 273 | |
| 12 | GF1220(2) | 1200 | 2000 | 304 | |
| 13 | GF1320(2) | 1300 | 2000 | 325 | |
| 14 | GF1320(1) | 1300 | 2000 | 332 | |
| 15 | GF1320(0) | 1300 | 2000 | 378 | |
| 16 | GF1520(0) | 1500 | 2000 | 366 | |
| 17 | GF1520(1) | 1500 | 2000 | 379 | |
| 18 | GF1520(0) | 1500 | 2000 | 382 |